Bridge works L2964 New Line Road, Glanmire
Road Alert, Nov. 1st 2024
Urgent Road Closure - L2964 New Line Road, Brooklodge, Glanmire from 31st October 2024 to 28th March 2025 to facilitate construction of New Line Bridge , walls.
CORK COUNTY COUNCIL
ROADS ACT, 1993
URGENT TEMPORARY CLOSING OF PUBLIC ROADS
Pursuant to Section 75 of the Roads Act, 1993, and Article 12 (6), in Part 8 of the Roads Regulations 1994, notice is hereby given that the urgent closure of the road as detailed below is necessary, in the interests of public safety.
Road Subject of Urgent Closure
L-2964 New Line Road, Brooklodge, Glanmire, Co. Cork.
Period of Urgent Closure
From 06:00hrs on Thursday 31st October 2024 to 18:00hrs on Friday 28th March 2025
(24hr Closure).
Reason for Urgent Closure
To facilitate construction of New Line Bridge and Associated Reinforced Concrete Walls for the Glanmire Flood Relief scheme.
Alternative Routes
Approaching from Glanmire on the L-2966 continue past the turn for the L-2964 and take the next Left on to the L-7022 continue to the T junction turn left on to the L-2964.
The stated diversion route is applicable in reverse when travelling in the opposite direction.
Local access will be maintained throughout the duration of the Road Closure.
You should note that this Urgent Closure does not facilitate the making of objections/observations.
Ref: URC 999006-2024
Director of Services,
Roads & Transportation,
Cork County Council
The Courthouse
Skibbereen
Co Cork
Email: roadclosures@corkcoco.ie
COMHAIRLE CONTAE CHORCAÍ
ACHT NA mBÓITHRE, 1993
DÚNADH PRÁINNEACH BÓITHRE POIBLÍ AR BHONN SEALADACH
De bhun Alt 75 d'Acht na mBóithre 1993, agus Airteagal 12 (6), i gCuid 8 de Rialacháin na mBóithre 1994, tugtar fógra leis seo go bhfuil dúnadh práinneach an bhóthair riachtanach de réir mar a shonraítear thíos, ar mhaithe le sábháilteacht an phobail.
Bóthar a Bheidh Faoi Réir an Dúnta Molta
L-2964 New Line Road, Cill Ruáin, Gleann Maghair, Contae Chorcaí.
Tréimhse an Dúnta Bóthair
Idir 06:00am Dé Máirt, an 31 Deireadh Fómhair 2024 agus 18:00pm Dé hAoine, an 28 Márta 2025
(Dúnadh 24 uair an chloig).
An Chúis atá leis an Dúnadh Molta
Chun tógáil New Line Bridge agus na Ballaí Coincréite Treisithe a bhaineann leis don scéim Cosanta Tuilte Ghleann Maghair a éascú.
Bealaí Malartacha
Má tá tú ag druidim leis ó Ghleann Maghair ar an L-2966, lean ar aghaidh thar an gcasadh atá ann don L-2964 agus tóg an chéad chasadh eile ar Chlé ar an L-7022. Lean ar aghaidh comh fada leis an T-acomhal agus cas ar chlé ar an L-2964.
Tá an bealach atreoraithe a luaitear infheidhme droim ar ais nuair atá tú ag taisteal an treo eile.
Coinneofar rochtain áitiúil fad is a bheidh an Dúnadh Bóthair i bhfeidhm.
Ba cheart go dtabharfá faoi deara nach gcuirfear an deis ar fáil chun agóidí a dhéanamh maidir leis an Dúnadh Práinneach seo ná tuairimí a thabhairt ina thaobh.
Uimhir Thagartha: URC 999006-2024
Stiúrthóir Seirbhísí,
Bóithre agus Iompar,
Comhairle Contae Chorcaí
Teach na Cúirte
Sciobairín
Contae Chorcaí
Seoladh ríomhphoist: roadclosures@corkcoco.ie
Want alerts like this?Signup for a free Co. Cork Alerts account